JKL Mouldings have a dedicated project department, meaning we can offer our customers full cradle to grave project management service. Each customer is allocated a Project Engineer to be a sole point of contact throughout the project life. With a combined 60+ years experience in the injection moulding sector, we can offer full component design input, including material selection, design for manufacture advice and tool specification guidance and sourcing.

The earlier we are involved in the product design stages the more successful the project will be!

Let us guide you through the process.

  • Customer RFQ received
  • JKL quotation returned within customers time frame
  • Customer P.O along with component 2D/3D data

Stage 1:

DFM (Design For Manufacture)
  • The project and Quality team along with nominated tooling supplier conduct a thorough review of the component for injection moulding suitability and feasibility, then feedback any concerns and recommendations / modifications that will improve the component for injection moulding manufacture.

Stage 2:

Mould Flow Analysis
  • A full mould flow analysis is then completed to confirm a stable and repeatable process can be achieved, this study includes the following :
  • Gate dimensional and positional review
  • Fill pattern and pressure study
  • Clamp force prediction
  • Gas trap and weld line prediction
  • Cycle time prediction
  • Warp analysis

Stage 3:

Tool Design
  • Our nominated tooling supplier will generate 2D and 3D tool designs these will be designed using the JKL tooling standards or customer specific tooling standards ensuring the correct machine interface specifics, tool steels, hot runner type/brand and ancillaries are used in the tool construction. The JKL engineering team will then conduct full tool design review to pass off the mould design before manufacture can proceed.

Stage 4:

  • The JKL nominated Project Engineer will issue weekly timing plans and progress images to ensure quoted lead times are achieve to ensure project milestones are adhered to.

Stage 5:

Tool trials and tool maturation
  • T1/T2 trials are conducted by our nominated tooling supplier, trial reports/PFUs (Problem Follow Up) and full ISIRs (Initial Sample Inspection Report) are issued after each trial stage, this ensures and gives confidence that 2D controlled dimensions can be achieved and any tooling maturation issues are resolved before delivery.
  • T3 trials (sign off trials) a JKL Engineer will be present at the toolmaker to ensure the tool and process is capable before the tool is shipped into our facility.

Stage 6:

Tool shipment
  • We offer Sea or Air freight options. Typical sea freight delivery is 6 weeks with air freight being 2 weeks (From China)

Stage 7:

UK Trials
  • On tool arrival at JKL our toolroom maintenance team will de-crate and strip clean and fully inspect the mould before it goes into a press for UKT1 trials.
  • Once the trial is planned into the production schedule the nominated JKL Engineer will issue a full trial report along with UK ISIR for the customer, the customer is also always welcome to attend the trials.

Stage 8:

PPAP (Production Parts Approval Process) submission
  • Once the mould tool has successfully trialled the final approval process can be completed, this will be documents that have been generated through the APQP (Advanced Product Quality Planning) process which is ongoing throughout the project forming the PPAP submission.

Stage 9:

SOP (Start Of Production)
  • If all of the above is complete and approved by the customer the project then is handed over to the production team for mass production.

JKL have tooling partners in low-cost countries in the Far East, but we also source tooling from suppliers in Europe and the UK, depending on the client’s specification requirements and budget needs.

Arrange an appointment

Talk to us
  • 0191 378 0598
  • enquiries@jklmouldings.co.uk
  • St Johns Road
    Meadowfield Ind Est
    Durham
    DH7 8XQ

    What can we help with?

    jkl mouldings, jkl mouldings ltd, plastic injection moulding, plastic injection moulding northeast, plastic injection moulding durham,
    Complete service from concept to mass production
    jkl mouldings, jkl mouldings ltd, plastic injection moulding, plastic injection moulding northeast, plastic injection moulding durham,
    27 Moulding machines, ranging from 35T to 850T
    jkl mouldings, jkl mouldings ltd, plastic injection moulding, plastic injection moulding northeast, plastic injection moulding durham,
    Dedicated department with 20 individual workstations
    jkl mouldings, jkl mouldings ltd, plastic injection moulding, plastic injection moulding northeast, plastic injection moulding durham,
    900 Euro pallet bay logistics centre
    JKL Mouldings
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.